HB Reavis Forest office building

28 December 2021

HB Reavis Forest office building. The building, which is under construction at the Zgrupowania AK "Radosław" roundabout in Warsaw, has 18 out of 28 floors. The target height of 120 meters will be reached next spring. The assembly of the energy-saving facade of the high-rise has already started, and the interior works are underway. at the end of 2021. In a few months, the construction of the lower Forest development will be completed. The part of the office campus located on the side of Burakowska Street is almost entirely glazed, and finishing works are underway in its center. The lower building will be ready in early 2021.

OCEŃ
5/5 (1)